PROJECTS IN PROGRESS

Sr No Name of Employer Name of Eng. Respo. For Supervision Name location and description of work Value of contract ( Rs. In Lacs)
1 Exe eng . Bridge project VMC Vadodara D.J.patel widening of Existing Bridge across river Vishwamitri on 40.0 m. ring road joining Vadsar - Kalali road and Vadasar land Fill at Vadodara 892.45
2 Exe. Eng. R & B Division , Himatnaagr Jatin Patel Widening of major bridge across riaver HATHMATI on himtnaagr - Khedbrahma - Ambaji Road SH9 KM2/800 to 4/075 with Approaches and Constructing minor bridge on River VEKARO on Himatnagar Idar Khedbrahma Ambaji road SH-9 km 36/735 to 37/800 with Approaches 3044.08
3 Exe. E.g. Panchyat ( R & B) Division Chhotaudepur Ankur Patel Construction a bridge on River Orsang to connecct village Tejgadh & Raisingpura of chhotaudepur Dist. Chhotaudepur 1328.34
4 Exe. Eng. Panchyat Rand B Divi. Vadodara Ankur Patel Construction of Major bridge ac River Orsang on Dewhat - Zoz Road at ch. 1-600 Ta. Chhota Udepur Dist. Chhota Udepur 1274.65
5 Exe eng PWD civil divi no 2 road DHN Silvaasa S A Patel Const of high level bridge at umarkui - silvassa road Ch 6 to 6.2 km. 332.58
6 Exe. Eng. R&B divi. Nadiayd Disst. Kheda M.K.Patel Four lanning of mahudha alina road km.30/150 top 43/0 (Pravasipath) Construction of major bridge across river Mahor on km 37/680 to 38/190 Dist kheda (major bridge & approaches across mohar river , reapairing to existing Bridge protective work & miscellan 1111.95

PROJECTS IN COMPLITED

Sr No Employee Name Name of Eng. Respo. For Supervision Name location and description of work Final Project Value date of Complite project Year of Complite project
1 Exe.Eng. Dist. R and B Div. Rajkot P.G.Patel Construction of New Four Lane Bridge with Raised kerb and Approches in Liue of Existing Cuseway Across River KARMAL Near village Kharchia between Km.32 to 33 on Rajkot Bhavanagar road.SH No. 25 954.41 28-02-2017 2016-17
2 Exe eng Capital Project divi No. 3 Gandhinagar M.K.Patel Const of major bridge on khari river on Dehgam chhala road near village Nadol ta. Dehgam Dist gandhinagar 625.03 30-07-2015 2015- 16
3 Exe eng N.H Divi adiur Kutch N.M. patel Const of major bridge across river Nayro in lieu of existing causeway at km. 157 .900 near village kothara km. 157. 900 on NH 8A Extn. 795.67 16-03-2031 2015- 16
4 The Exe.Eng Road Dept. Bbhavnagar Mun. Corpo. Jatin Patel Const. of Six Lane Bridge on Virani Chawk to Leela Circle Road - Kaliyabid on Kansara River- Bhavangar. 450.11 15-12-2031 2015- 16
5 The Exe.Eng Road Dept. Bhavnagar Municipal Corporation. Jatin Patel Construction of Four Lane Bridge on Sardar Patel School To Hill Park Road-Kaliyabid on Kansara River- Bhavangar. 316.45 15-12-2031 2015- 16
6 Exe eng Panch. R and B Divi Tapi Vyara Maulik patel Constrcting a major Bridge across river Valmiki on Buhari Dadariya Kelui Vedchhi road joining SH 187 Ta. Valod Dist. Tapi 830.45 16-05-2028 2015- 16
7 Exe eng Panch. R and B Divi Tapi Vyara Maulik patel Const of high level submersible major bridge with approaches Across river Purna naer pelad buhari Ta valod Dist Tapi 900.83 15-05-2018 2015- 16
8 Exe. Eng. Bridge SMC Surat Suresh A. Patel Construction of creek bridge on 24.0 m. road of DTS no. 59 (UNN) and DTS no.67( Jiav -Sonari - Gabheni) of south zone surat. 286.55 15-07-2031 2015- 16
9 The Exe. Eng , Panchayat R & B Division , Valsad SAPATEL Haidri Approach Road . Tal. Dharampur Dist. Valsad 74.38 16-02-2021 2015- 16
10 Executive Engineer Capital Project Division No.3,Gandhinagar D.M.patel 5054 C.O. On Road & Bridge- 03 State Highway - 337 road - 11 Original work, Repairing of Bridge A/c River Sabarmati on Sargasan Dholakuva Shahpur Lavarpur (SH) road near Indroda village. 61.82 15-01-2031 2015- 16
11 Executive Engineer, PWD, Civil-Division No-II(R), DNH, Silvassa. D.M.patel Construction of High level bridge at Umarkui – Hatpada. (Ch.2/6 to 2/8km). 335.95 14-08-2028 2015- 16
12 Exe eng . Bridge project VMC Vadodara Dilip Patel Cons. Of Bri. Acroce Vishwamitri river on manalpur -Atladara 36.0m wide road 982.45 14-05-2030 2014-15
13 Executive Engineer Dist R & B Divi Vadodara Jatin Patel Construction of Major Bridge on HERAN River on Shankheda-Handod-Songir-Kothiya-Chametha Road with both side approach (ODR) Ta. Sankheda Dist Vadodara 901.80 14-06-2025 2014-15
14 Exe. Eng. R & B Divi. Bhavnagar Bhavnagar Jatin Gajjar Widening of OVEN Bridge on Songadh-palitana- Talaja Road (SH) KM 55/8 to 56/0 Dist:- Bhavnagar 406.75 13-08-2014 2014-15
15 Exe. Eng. PWD civil Divi no 2 road DHN Silvaasa M.T.Patel Construction of high level bridge at morkhal dungripada on kilvani morkhal road . 378.46 11-02-2014 2013-14
16 The Exe. Eng. R & B Division, Panwadi Campers Bhavnagar N.M.PATEL Construction of proposed bridge on Shetrunji river on Palitana Talaja road. (S.H.-35) Taluka Palitana, Dist. Bhavnagar 785.35 31-01-2013 2012-13
17 The Exe. Eng. Kheda R & B Division, NADIAD Suresh A. Patel Improvement to overtopping sections of Dholka – Kheda Road During heavy rain / flood ( Ch. 36/6 to 53/2) (Construction of New Khari bridge with Approaches and Retaining wall 627.70 31-12-2012 2012-13
18 Dy. Chief. Eng. ( C) II, Western Railway Ratlam ( MP) Jatin Gujjar Const.of new Major Bri. No.11 on new alig. of at from Indore on GAMBHIR River of 4 x 24.40m clear span (skew Span 30.50m) PSC box girder bridge as per contractor’s of new BG line between Dahod - Indore Project of Western Railway. 592.01 12-12-2031 2012-13
19 Exe. Eng. Dang ( R&B) Division Ahwa Dhaval M.Patel Constructing Bridge with approaches across river Ambica on Waghai –saputara Road near village Susarda 946.84 12-06-2021 2012-13
20 The Exe. Eng. R & B Division, Panwadi Campers Bhavnagar P.G.Patel Construction of major bridge on Navli river on Gopnath Talaja road. (S.H.) No. 31 K.M. 9/0 to 10/0. Ta. Palitana, Dist. Bhavnagar.. 455.08 12-09-2030 2012-13
21 Dy. Chief. Eng. Const) BOT Western Railway, AHMEDABAD S. Gopal krishan Construction of (8 x 18.30m. Span PSC girder)bridge on Chakkar River at Railway Chainage 21492.38 on the new alignment in connection with Patan - Bhildi New BG lin 475.53 11-04-2030 2011-12
22 Dy. Chief. Eng. Const) BOT Western Railway, AHMEDABAD Jatin Gujjar Dismantling of existing sub-structure &foundation, Const.of bridges No. 126 (1 x 12.20m. Span PSC girder) on canal and bridge No. 128 (5 x 18.30m. Span PSC girder) on Sarswati Spill between Patan & Khalipur on the existing alignment in connection with Patan - Bhildi New BG line 455.43 11-01-2031 2010- 11
23 The Exe. Eng. Panchayat R & B Divi. SURAT Dhaval. M.Patel Construction a Bridge a/c KAVERI river on Anawal Panch – Kankara road ( V.R.) Taluka : Mahuwa Dist, Suarat 306.62 10-05-2005 2010- 11
24 Exe. Eng. R & B Divisi. BHAVNAGAR Nikunj Patel Construction of major bridge across river Rangholi on Noghanvadar sanosara Dhola road, Dist. Bhavnaga 781.92 11-02-2010 2010- 11
25 Dy. Chief. Eng. Const) BOT Western Railway, AHMEDABAD Jatin Gujjar Dismantling of existing sub-structure & foundation, Construction of bridge No. 127 (10 x 18.30m. Span PSC girder) on Sarswati river between Patan & Khalipur on the existing alignment in connection with Patan – Bhildi New BG line. 755.42 11-01-2015 2010- 11
26 Exe. Eng. Kheda (R & B) Division, NADIAD S.A.Patel Construction a bridge in place of existing dip a.c river LAVERI on pali Balasinor Virpur Gandhari road near village VIRPUR 403.20 10-05-2031 2010- 11
27 The Exe. Eng. Panchayat R & B Divi. SURAT Dhaval. M.Patel Construction a Bridge a/c KAVERI river on Anawal Panch – Kankara road ( V.R.) Taluka : Mahuwa Dist, Suarat 87.65 10-08-2020 2010- 11
28 Dy. Chief Eng. W/Railway Dadar, MUMBAI Suresh A. Patel Rebuilding of Bridge no – 400 ( 8 x 18.30m. + 1 x 13.7m span ) at km. 238/ 5-11 between NAVSARI & Maroli stations of virar – surat section of Mumbai division by constructing 9 x 18.3 m PSC girders on RCC pile found. On per. Diversion. 535.09 31-10-2008 2008-09
29 The Exe. Eng. , N.H. Division, GANDHIDHAM Nukunj M. Patel Construction of Major Bridge in lieu of Existing causeway A/c river SURAI at km. 61/0 to 61/60 on N.H. 8 A ( Extn.) near village Samagogha. Job. No 08A (Extn) – GJ – 2006 – 409 377.62 20-11-2008 2008-09
30 Exe. Engineer, R & B , Division. PALANPUR Dhaval.M. Patel Construction of Bridge with approaches on DANTIWADA diversion 551.00 30-12-2008 2008-09
31 Deputy Chief Engineer, Western Railway Dadar, MUMBAI Dilip J.Patel Rebuilding of Bridge no. 358 (10x18.30m.span ) at km. 213/28-31 between Joravarsan and BILIMORA stations of Virar – Surat section of Mumbai Division by construction 10 x18.30m. PSC Box on RCC pile foundation on permanent diversion. 590.24 07-07-2031 2007-08