PROJECTS IN PROGRESS

Sr No Name of Employer Name of Eng. Respo. For Supervision Name location and description of work Value of contract ( Rs. In Lacs)
1 Exe. Eng. R&B divi. Nadiayd Disst. Kheda S.S.PATEL Construction of Four lane R.O.B with divided carriage way I approaches in lieu of Existing L.C No 276 at km 452/23-25 between station Nadiad & Gothaj of vadodara division on Road from Dabhan to Dakor Dist : Kheda of Gujarat State 1312.03
2 Exe. Eng. R&B Division , Ahemdabad PGP Construction of R.O.B. in lieu of L. C. No. 114 at Ahmedabad - Botad Railway on Bagodara - Dhandhuka Road Km. 103 2127.87
3 Dedicated Freght Corpoation of India Ltd. Ministry of railways , jaypur DMPATEL Construction of two lane ROB (Oncluding approaches and LHS) in lieu of level crossing No. 102 at IR Chainage 139/0-1 , between shri madhopur and Ringas statinos on Rewari - Phulera Section of Jaipur division of North Western Railway 2450.31
4 AUDA Ahmedabad Djpatel construction of FLY over bridge on ODHAV Jection allong S.P. RING road Auda area MSKEL JV ACC share 65.35 total project cost : Rs.51.93 crore Our Share 35 percent : Rs. 18.17 Crore. 1817.58

Project completed

Sr No Employee Name Name of Eng. Respo. For Supervision Name location and description of work Final Project Value date of Complite project Year of Complite project
1 Exe Eng R and B Divi Mahesana Djpatel Construction of ROB on Mehsana Bye pass Km 0 to 16-8 ROB Ch. Km.1-560 on Mehsana Viramgam Railway line and Ch. Km.12-560 on Mehsana Patan Railway line. Dist. Mehsana. MSKEL-ACC -JV, share 60:40 total Project Cost : 44.80 cr. Our share 40 percent : Rs. 14.22 Cr.) (35.55 +10.46 cr. Excess=46.01 cr. (4601 @ 40%) =18.40 cr. 4477 2017-05-30 2017-18
2 Dy. Chief Eng . Const. Western Railway Vadodara P.G.Patel Const of road over bridge adjoining to existing ROB in lieu LC no 9B at between BRC & pilol on BRC - GDA section ( Savli ROB vadodara) 781.02 2031-03-15 2014-15
3 Executive Engineer (Bridge) S.M.C. Surat A.P.PATEL Construction of ROB in lieu of L.C. No. 2 on Bhestan – on Bhusaval Loop Line Near old Dindoli Octroi Naka On Dindoli main Road at Suarat . 1646.15 2031-03-14 2013-14
4 The Comm. of Health , P.I.U. Implementati on Unit Gandhinagar D.M.Patel Connecting bridge between referral Hospital and Cancer Hospital at Siddhpur , Dist. Patan (Reinvaded) 257.16 2014-03-20 2013-14
5 The Managing Director G.S.R.D.C. LTd. Gandhinagar S. Gopal krishan Construction of ROB Fly Over including approaches in lieu of existing level crossing no.- 189 B near Jamnagar in km. 84 6 8 on Rajkot Jamnagar Road S H 25 1005.72 2028-02-10 2009-10
6 Dy. Chief Eng. ( C ) P & D, Western Railway AHMEDABAD Dilip J. Patel Construction of Road Over Bridge in lieu of L.C. no. 6 A & 6B between stations Chandalodia and Ambli Road on Ahmedabad – Viramgam Section 618.37 2005-02-09 2008-09
7 Dy. Chief Eng. Northern Railway, MORADABAD (U.P.) P.G. Patel Const. and placing in position of RCC girder of 10x18+1 x21+1 x14m and design, construction & placing of PSC box of 1 x 41m clear span and other allied works in c/with Road Over Bridge in lieu of level crossing no. 358/spl & 250 – A/3T on Pilibhit- Badaun Road at BAREILLY at km. 1309/m13-14. 524.49 2008-10-31 2008-09