1 |
The
Executive
Engineer
Rand B Divi.
Mehsana |
S.A.Patel |
Construction of RCC Box to cover
existing drain joining up to
Radhanpur Mehsana Road to
Dediyasan road crossing of
Mehsana ( APPL - RADHE JV 51:49)
6145.15 LCS @ 51% = 3134.02
SHARBBBBBE |
57.46 |
2021-08-18 |
2021-22 |
2 |
DFCCIL
JAYPUR |
D.M.Patel |
Construction of two lane ROB
(Oncluding approaches and LHS) in
lieu of level crossing No. 102 at IR
Chainage 139/0-1 , between shri
madhopur and Ringas statinos on
Rewari - Phulera Section of Jaipur
division of North Western Railway |
25.42 |
2019-12-23 |
2019-20 |
3 |
Exe. Eng. R
andB
Division,
Nadiad |
S.M.patel |
Construction of Four lane R.O.B
with divided carriage way I
approaches in lieu of Existing L.C
No 276 at km 452/23-25 between
station Nadiad and Gothaj of
vadodara division on Road from
Dabhan to Dakor Dist : Kheda of
Gujarat State |
25.99 |
2019-02-20 |
2018-19 |
4 |
Exe Eng R
and B Divi
Mahesana |
D.J. Patel |
Construction of ROB on Mehsana
Bye pass Km 0 to 16-8 ROB Ch.
Km.1-560 on Mehsana Viramgam
Railway line and Ch. Km.12-560 on
Mehsana Patan Railway line. Dist.
Mehsana. MSKEL-ACC -JV, share
60:40 |
46.06 |
2017-05-30 |
2017-18 |