PROJECT COMPLETED

Sr No Employee Name Name of Eng. Respo. For Supervision Name location and description of work Final Project Value date of Complite project Year of Complite project
1 Exe. Eng.N H. Division, Plot No.-1, Ward-3B, Tagore road, ADIPUR Kachchh) D.M.Patel Construction of proposed 4-Lane R.O.B and its approaches in replacement of existing old and narrow ROB ( LC No. 149A) at Ch 39.885 on NH-168A near DHANERA in Banaskantha District in the State of Gujarat. On EPC Mode 33.23 30-07-2021 2021=22
2 The Executive Engineer Rand B Divi. Mehsana S.A.Patel Construction of RCC Box to cover existing drain joining up to Radhanpur Mehsana Road to Dediyasan road crossing of Mehsana ( APPL - RADHE JV 51:49) 6145.15 LCS @ 51% = 3134.02 SHARBBBBBE 57.46 18-08-2021 2021-22
3 The Chief Eng. / C/III , 2nd Floor, Western Railway , Ahmedabad P.G.Patel Construction of 4-Lane Road over Bridge (1 Span of 66 Mtrs. Through Truss type Steel Composite Girder and 2 Spans of 13.00 Mtrs. Steel Plate composite Girder) in lieu of LC No. 11A at Km 512/8 - 512/9 on Ahmedabad - Viramgam section on Thaltej - Shilaj - Rancharda Road at Ahmedabad 23.79 31-01-2021 2021-22
4 Exe. Eng. (RandB) Panchayat Division Chotaudepu r Ankur Patel Construction a bridge on river orsang to connect village Tejgadh and Raisingpura of chhotaudepur Dist. Chhotaudepur 22.84 14-03-2020 2019-20
5 DFCCIL JAYPUR D.M.Patel Construction of two lane ROB (Oncluding approaches and LHS) in lieu of level crossing No. 102 at IR Chainage 139/0-1 , between shri madhopur and Ringas statinos on Rewari - Phulera Section of Jaipur division of North Western Railway 25.42 23-12-2019 2019-20
6 Exe. Eng. R andB Division, Nadiad S.M.patel Construction of Four lane R.O.B with divided carriage way I approaches in lieu of Existing L.C No 276 at km 452/23-25 between station Nadiad and Gothaj of vadodara division on Road from Dabhan to Dakor Dist : Kheda of Gujarat State 25.99 20-02-2019 2018-19
7 Exe Eng R and B Divi Himtnaagr J.A.Patel Widening of major bridge across riaver HATHMATI on himtnaagr - Khedbrahma - Ambaji Road SH9 KM2/800 to 4/075 with Approaches and Constructing minor bridge on River VEKARO on Himatnagar Idar Khedbrahma Ambaji road SH-9 km 36/735 to 37/800 with Approaches Dist. Sabarkantha 35.44 30-06-2018 2018-19
8 AUDA Ahmedabad D.J. Patel construction of FLY over bridge on ODHAV Jection allong S.P. RING road Auda area MSKEL JV ACC share 65.35 total project cost : Rs.51.93 crore Our Share 35 percent : Rs. 18.17 Crore. 55.22 07-07-2019 2018-19
9 Exe Eng R and B Divi Mahesana D.J. Patel Construction of ROB on Mehsana Bye pass Km 0 to 16-8 ROB Ch. Km.1-560 on Mehsana Viramgam Railway line and Ch. Km.12-560 on Mehsana Patan Railway line. Dist. Mehsana. MSKEL-ACC -JV, share 60:40 46.06 30-05-2017 2017-18