Avadhoot Construction Company

PROJECT COMPLETED

Sr No Employee Name Name of Eng. Respo. For Supervision Name location and description of work Final Project Value (Rs.in Cr.) date of Complete project Year of Complete project
1 PGPatel Exe. Engi. R&B Division , PALANPUR Construction of New Major Bridges On Umardasi River on Ahmedabad Mehsana Palanpur Road, (SH 41), Km. 129/000 to 130/000, Dist. : Banaskantha 21.69 06-06-2025 2025-26
2 DJPatel The Executive Engineer, National Highway Division, Ahmedabad Development of Chiloda-Gandhi nagar-Sarkhej of NH-147 (Old NH-BC) from Km. 0/0 to 44/420 in the State of Gujarat to Six-lane with paved shoulders with both side continuous service road on EPC mode. 167.88 30-04-2025 2025-26
3 Smitan Exe. Eng R &B Division , Anand Construction of ROB in Lieu of L.c. No .28 at km 20/4 Between Bhatiel - Pelad Block Section on Anand - Petlad Railway line 25.4 10-04-2025 2025-26
4 MKPatel Executive Engineer Valsad ( R and B ) Valsad Proposed ROB in Lieu of LC No 84 at KM 178/22-24 (DFCC CH 19814.31) between stations Udvada - Vapi. 62.24 05-12-2024 2024-25
5 DJPatel Exe. Eng. RandB Division , Ahemdabad Construction of R.O.B. in lieu of L. C. No. 114 at Ahmedabad - Botad Railway on Bagodara - Dhandhuka Road Km. 103 42.66 02-12-2024 2024-25
6 JAPatel City Engineer A.M.C Ahmedaabd Construction Of 2 Lane Split FLY OVER On Both Sides Of Existing Narol –Naroda Road At Ghodasar Canal Crossing In Ahmedabad City 64.34 10-05-2024 2024-25
7 PGP City Engineer A.M.C Ahmedaabd Const. of 4 Lane ROB on Ahmedabad- Viramgam BG Raiwlay Line Between km. 510/6 and 510/7 in lieu of lc no.6 Connecting chenpur to Godrej - garden city - S.G. highway at. Jagatpur- Ahmedaabd 61.62 15-06-2023 2023-24
8 A.P.PATEL The Executive Eng District ( R andB) Division Vadoda Construction of ROB at Railway line Across Dabhoi – Karjan Raod ( ROB- 8/ L.C. no. 2 ) in connection with Dabhoi – Chanod-project with extension up to Kevadiya 24.51 30-05-2023 2023-24
9 S.A.Patel The Executive Engineer Rand B Divi. Mehsana Construction of RCC Box to cover existing drain joining up to Radhanpur Mehsana Road to Dediyasan road crossing of Mehsana ( APPL - RADHE JV 51:49) 6145.15 LCS @ 51% = 3134.02 SHARE 57.46 18-08-2021 2021-22
10 D.M.Patel Exe. Eng.N H. Division, Plot No.-1, Ward-3B, Tagore road, ADIPUR Kachchh) Construction of proposed 4-Lane R.O.B and its approaches in replacement of existing old and narrow ROB ( LC No. 149A) at Ch 39.885 on NH-168A near DHANERA in Banaskantha District in the State of Gujarat. On EPC Mode 33.23 30-07-2021 2021-22
11 P.G.Patel The Chief Eng. / C/III , 2nd Floor, Western Railway , Ahmedabad Construction of 4-Lane Road over Bridge (1 Span of 66 Mtrs. Through Truss type Steel Composite Girder and 2 Spans of 13.00 Mtrs. Steel Plate composite Girder) in lieu of LC No. 11A at Km 512/8 - 512/9 on Ahmedabad - Viramgam section on Thaltej - Shilaj - Rancharda Road at Ahmedabad 23.79 31-01-2021 2021-22
12 Ankur Aatel Exe. Eng. (RandB) Panchayat Division Chotaudepur Construction a bridge on river orsang to connect village Tejgadh and Raisingpura of chhotaudepur Dist. Chhotaudepur 22.84 14-03-2020 2019-20
13 D.M.Patel DFCCIL JAYPUR Construction of two lane ROB (Oncluding approaches and LHS) in lieu of level crossing No. 102 at IR Chainage 139/0-1 , between shri madhopur and Ringas statinos on Rewari - Phulera Section of Jaipur division of North Western Railway 25.42 23-12-2019 2019-20
14 S.M.patel Exe. Eng. R andB Division , Nadiad Construction of Four lane R.O.B with divided carriage way I approaches in lieu of Existing L.C No 276 at km 452/23-25 between station Nadiad and Gothaj of vadodara division on Road from Dabhan to Dakor Dist : Kheda of Gujarat State 25.99 20-02-2019 2018-19
15 D.J. Patel AUDA Ahmedabad construction of FLY over bridge on ODHAV Jection allong S.P. RING road Auda area MSKEL JV ACC share 65.35 total project cost : Rs.51.93 crore Our Share 35 percent : Rs. 19.32 Crore. 55.22 07-01-2019 2018-19
16 J.A.Patel Exe Eng R and B Divi Himtnaagr Widening of major bridge across riaver HATHMATI on himtnaagr - Khedbrahma - Ambaji Road SH9 KM2/800 to 4/075 with Approaches and Constructing minor bridge on River VEKARO on Himatnagar Idar Khedbrahma Ambaji road SH-9 km 36/735 to 37/800 with Approaches Dist. Sabarkantha 35.44 30-06-2018 2018-19
17 Djpatel Exe Eng R and B Divi Mahesana Construction of ROB on Mehsana Bye pass Km 0 to 16-8 ROB Ch. Km.1-560 on Mehsana Viramgam Railway line and Ch. Km.12-560 on Mehsana Patan Railway line. Dist. Mehsana. MSKEL-ACC -JV, Our Share 40 percent 46.06 cr @ Rs.18.42 cr. 46.06 30-05-2017 2017-18